O and J Superior Plumbing logoCall (254) 404-2242

Remodel Plumbing in Temple, TX

Moving a sink, adding a bathroom, or turning a tub into a walk-in shower? We handle the plumbing behind your remodel, from the pipes in the wall to the finished fixtures.

New red and blue water lines and a white drain pipe inside an open bathroom wall
Texas Plumbing License 41774 · $89 service call · Monday–Friday 7am–4pm

Remodel Plumbing We Handle

Kitchen Remodels

Moving or adding a sink, running lines to an island, and connecting new fixtures.

Bathroom Remodels

Relocating toilets, sinks, and showers, and setting new fixtures.

Tub-to-Shower Conversions

A new shower valve and drain where a tub used to be.

Adding a Bathroom

New water and drain lines for a bathroom that didn't exist before.

Laundry Room Moves

Water, drain, and gas connections for a washer and dryer in a new spot.

Replacing Old Pipes

Open walls are the best chance to replace aging pipe.

Plan the Plumbing Early

Plumbing happens in two stages in a remodel. Rough-in is the pipe work inside walls and floors, done before the drywall goes up. Finish is setting the sinks, toilets, and faucets at the end.

Moving a fixture a few feet can be simple or a big job, depending on where the drain has to go. On a slab foundation, which most Temple homes have, moving a drain can mean cutting into the concrete.

Talking through the plumbing before the design is final helps keep surprises, and costs, down.

¾″ COPPERGATE VALVEPRESSURE GAUGE90° ELBOW4′-0″O & J PLUMBINGDWG 01 · SUPPLY RUNTEMPLE, TX · NTS

Remodel Plumbing Questions

Don't see your question? Call us at (254) 404-2242.

Can I move my toilet or sink to a new spot?

Usually, yes. What it takes depends on how far the drain has to move and what's underneath. On a slab foundation, moving a drain often means opening the concrete floor, so it's worth knowing before the layout is final.

When should the plumber come in during a remodel?

Twice. First for rough-in, after demolition and framing but before the walls are closed, and again at the end to install fixtures once counters, tile, and cabinets are in.

What does "rough-in" mean?

It's the plumbing that ends up hidden: water lines, drain pipes, and vents run through the walls and floor. It's done and checked before drywall and tile cover it up.

Should I replace old pipes while the walls are open?

It's a good time to consider it. Replacing pipe while it's already exposed costs far less than opening finished walls later.

Do I need a permit for remodel plumbing?

Moving or adding plumbing often requires a permit and inspection, depending on your city. Check with your city's building department before work starts.

Planning a Remodel?

Call O and J Superior Plumbing in Temple. Our service call is $89.